Designed to prevent the risk of
rework and on-site damage to surfaces, the SupaBord product range assist in
reducing the carbon footprint and ecological impact on construction and
renovation projects.
INSTALLATION INSTRUCTIONS
Learn
the basics in four easy steps and become an expert in no time.
STEP 1
Ensure the subfloor (base floor) is CLEAN and DRY. Use a clean and
dry rag to wipe
outside before tape. Remove plastic sleeve from the SupaBord roll.
Roll out SupaBord
over the flooring area or surface, logo side facing up.
STEP 2
Cut SupaBord to length with a utility
knife, ensuring the seams are neat and fit well together.
STEP 3
Tape the SupaBord butt joints, long joints and perimeter with SupaBord Joint Tape.
Do not apply SupaBord Joint Tape to floor surfaces as it may
affect some finishes.
STEP 4
Apply SupaBord Edge Tape
Contact us for more information and follow us @Instagram
No comments:
Post a Comment