Sunday 3 June 2018

SupaBord Installation Instruction








Designed to prevent the risk of rework and on-site damage to surfaces, the SupaBord product range assist in reducing the carbon footprint and ecological impact on construction and renovation projects.




INSTALLATION INSTRUCTIONS 

Learn the basics in four easy steps and become an expert in no time.



STEP 1 
Ensure the subfloor (base floor) is CLEAN and DRY. Use a clean and dry rag to wipe 
outside before tape. Remove plastic sleeve from the SupaBord roll. Roll out SupaBord 
over the flooring area or surface, logo side facing up. 
STEP 2 
Cut SupaBord to length with a utility knife, ensuring the seams are neat and fit well together. 
STEP 3 
Tape the SupaBord butt joints, long joints and perimeter with SupaBord Joint Tape
Do not apply SupaBord Joint Tape to floor surfaces as it may affect some finishes. 
STEP 4 
Apply SupaBord Edge Tape 








Contact us for more information and follow us @Instagram


No comments:

Post a Comment